bids (documents)
Found in 1731 Collections and/or Records:
Mirabel Generators Replacement Project, Contract #60-6-7 #37 (Water Agency), 2008 July 10-2010 April 28
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Heights Water Pollution Control Project (70-26-7 #1), 1987 February-2001 February 21
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Heights Water Pollution Control Project (70-26-7 #2), 1999 May-2002 December 19
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Pre-engineered Metal Storage Building (Contract #60-6~7 #31), 2005
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Pumphouse 3, 4 and 5 Contractor Replacement Project--Contract #60-6-7 #32A, 2005
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Pumphouses 3, 4 and 5 Half-Ton Hoists Project (Contract No. 60-6-7 #25), 1998
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Road shoulder widening, 1996
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel Site Seismic Improvements 11.05.13, Item #11, 60-65-7 #2 (SCWater Agency), 2013
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel/Wohler Cathodic Protection, 1996
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.
Mirabel/Wohler Security, 1997
Per the most recent retention schedule (adopted 2008 December 9), this file classed as part of the series: Construction files (CAAR-0260). Records in this series are described as: Project files for the construction or renovation of County facilities & systems or for County managed projects. Includes: bid, contract, construction, & environmental documents, correspondence, reports, studies, design and safety records. Filed alphabetically by project.