Request for closure of underground storage tanks (UST) 1, 2, 3, 4, 5, 8, and hobby shop site - includes concurrence from crwqcb for underground storage tanks (UST) 6 and 7, dated 23 May 1996; and concurrence from county of sonoma public health department for underground storage tank (UST) 9, dated 5 October 1990, 2005 May 31
File — Document 307
Identifier: SCG.00081.000307
Scope and Contents
Document scope: Site 00006, UST 000001, UST 000002, UST 000003, UST 000004, UST 000005, UST 000006, UST 000007, UST 000008, UST 000009.
Dates:
Issued: 2005 May 31
Request for drinking water determination, shallow groundwater exemption from consideration as a municipal or domestic water supply, 2006 February 28
File — Document 381
Identifier: SCG.00081.000381
Scope and Contents
Document scope: Basewide.
Dates:
Issued: 2006 February 28
Transmittal of 1) final site work plan phase 2 time-critical removal action, former landfill, site 2, dated 31 January 2005; and 2) waste and contaminated soil removal projects, dated 2 February 2005, 2005 February 27
File — Document 296
Identifier: SCG.00081.000296
Scope and Contents
Document scope: Site 00002.
Dates:
Issued: 2005 February 27
Transmittal of draft action memorandum/removal action work plan phase 2 time-critical removal action at site 2, dated 14 October 2004, 2004 October 13
File — Document 285
Identifier: SCG.00081.000285
Scope and Contents
Document scope: Site 00002.
Dates:
Issued: 2004 October 13
Transmittal of draft basewide proposed plan, dated 1 January 2006, 2006 January 29
File — Document 372
Identifier: SCG.00081.000372
Scope and Contents
Document scope: Basewide.
Dates:
Issued: 2006 January 29
Transmittal of draft petroleum sites closure report, dated 14 January 2005 (public document), 2005 January 17
File — Document 281
Identifier: SCG.00081.000281
Scope and Contents
Document scope: UST 000003, UST 000004.
Dates:
Issued: 2005 January 17
Transmittal of draft sampling and analysis plan (field sampling plan and quality assurance project plan) for additional soil sampling at evaporation ponds near buildings 21 and 156, dated 22 December 2004, 2005 January 6
File — Document 283
Identifier: SCG.00081.000283
Scope and Contents
Document scope: Basewide.
Dates:
Issued: 2005 January 6
Transmittal of draft sampling and analysis plan (field sampling plan/quality assurance project plan) phase 2 time-critical removal action at site 2, dated 10 November 2004, 2004 November 16
File — Document 287
Identifier: SCG.00081.000287
Scope and Contents
Document scope: Site 00002.
Dates:
Issued: 2004 November 16
Transmittal of draft site work plan, electrical cable removal, dated 1 June 2005, 2005 June 23
File — Document 299
Identifier: SCG.00081.000299
Scope and Contents
Document scope: Basewide.
Dates:
Issued: 2005 June 23
Transmittal of final report, electrical cable removal, dated 31 January 2006, 2006 January 29
File — Document 382
Identifier: SCG.00081.000382
Scope and Contents
Document scope: Basewide.
Dates:
Issued: 2006 January 29